Residential Permit                              

New Residential Permit and  design steps:

  • Zoning and Site verification
  • Detailed design and drawings
  • Building Permit
  • Construction
  • Home Renovation, Addition and Alteration(Includes Interior renovations, Decks, Garages etc.)

 Renovation steps:

  • Zoning verification
  • Detailed design and drawings
  • Building Permit
  • Construction
  • Above grade Side Entrance
  • Above grade side entrance is created by opening a new door in side wall. Door has to be minimum 4’0” from owner’s side property line.
  • Below Grade Entrance
  • Below grade entrance may be in rear yard or side yard provided side yard width is adequate. It should have few steps going down and at bottom a new door opening in exterior wall of basement.                                                                                                                                                                                               Previous                                                                                                                                                                                                                                Home
X